ask for redundancy no resiliancy
Refer to the exhibit.
A stadium wants to deploy location-based services, including blue-dot wayfinding over a 200.000
square root (isr580 sq. m) are
a. The custom past particular areas. The customer has selected a 1 year subscription.
The exhibit shows the BOM that the architect created in iris.
Which correction should the architect make?
A
A customer has an Aruba solution with APs, MCs, and an MM The customer also uses AirWave and
ClearPass. The customer wants to add Aruba CX Switches, which use per-user tunneled node, to the
solution.
How should the Aruba CX Switches integrate with the existing solution in order to determine when
to tunnel device traffic to MCs?
C
A customer has critical wired endpoints. However, each endpoint has a single Ethernet connection to
the network. The customer wants redundancy in the switch access layer to minimize the chances that
an endpoint will lose this connection
The architect plans to deploy two Aruba CX 6405 switches in the closet.
Which plan provides the greatest redundancy for this scenario?
B
ask for redundancy no resiliancy
A mall requires a wireless network upgrade to 802 -Max The company that owns the mall wants to
provide the APs for the entire mall. However, several of the larger national chain retailers with
spaces in the mall want to offer wireless services with their own SSIDs.
These individual retailers also have their own wireless guest services and wireless client devices They
have their own corporate infrastructure and want to handle all of this wireless traffic on their own,
including terminating the traffic on their own controllers. The mall requires redundancy for its
services, out the retailers do not.
Which plan for mobility controllers (MCs) and mobility master (MW) meets the needs of this
scenario?
A
The MM can´t control both MC
A retailer currently has two redundant ClearPass C2000 0L36O Gen9 hardware appliances and two
perpetual 1K Access licenses. The customer uses ClearPass to authenticate employee wireless
devices and other corporate wireless devices. ClearPass togs indicate that, peak license usage is
currently 1900.
The customer now wants to add a guest access solution. Guests will connect to an open SSiD and be
redirected to a portal which they can use to self-register and log in. The customer anticipates that up
to f 550 guest devices will connect at the same time.
The customer requires the most cost-effective solution that will meet the requirements. What should
the network architect recommend for this solution?
D
A customer has multiple, very small branch sites that require just one or two APs each. The office has
a local Internet connection, but all of the traffic is destined To the corporate data center, which has
an Aruba wireless solution.
Which branch office solution best meets the customer needs?
C
Refer to the exhibit.
A customer requires a core switching solution for a very large multi-building campus with about
30;ooo wireless clients and devices. The network will have a flat topology as shown in the exhibit,
and MCs will forward all wireless traffic to the core for routing.
The customer had considered Aruba 5400R Series switches, but the architect recommends Aruba
S320 switches Instead.
How should the architect justify this recommendation?
B
A customer has an Aruba wireless network. which includes two MC 7205s and an MM at the network
core. The company now wants to accommodate 50 mobile trainers These trainers travel around the
world and run training events. The trainers often need to access materials in the company data
center, but cannot reach materials when they are on the road.
The company wants to give the mobile workforce a secure way to reach the materials they need no
matter where they are.
including in public spaces like the hotels where they often leach. The customer also requires that the
solution be as cost
effective as possible while meeting the requirements.
Which plan meets the needs of the mobile Trainers?
B
A customer has multiple medium and large branch sites, eacri of which requires between S ana 16
APs and supports between 200 and 600 wireless clients, Every branch site has an Internet
connection, which it uses to reach the central data center. The customer would prefer the WAN links
to be optimized in the solution.
Different use cases require SSID's for tunneled traffic from remote sites to central location, traffic that
must remain local on the remote site, and traffic which would need to egress out from remote site
Internet connection.
Which branch office solution best meets the customer needs?
A
Refer to the exhibit.
The exhibit shows the topology for a new Aruba solution. The MCs are in a ctuster and support all of
the wireless traffic in
the network The core switches route all traffic and support all VLANS. The access fayer switches do
NOT use tunneiednode. or dynamic segmentation.
The customer has indicated that it has these VLANS for user devices.
* VLAN 11 for Floori employee wired devices
* VLAN 12 for Floor 2 employee wired devices
* VLAN 13 tor Floor 3 employee wired devices
* VLAN 14 for Floor 4 employee wired devices
* VLAN 15 for Floor 5 employee wired devices
* VLAN 101 for all employee wireless devices
* VLAN 102 for all guest wireless devices
In which locations should the architect plan the VLANs?
C
A customer has an existing; Aruba wireless solution to provide wireless access for employees. The
solution Includes Aps, mobility controllers (MCs) at the network core, and a Mobility Master (MM} A
customer would like to set up a separatelymanaged guest network and have the traffic go directly to
the DMZ.
What should the architect suggest as the simplest solution that meets the requirements?
C
A retailer wants to add a wireless network to its stores to provide guest access. The store has wired
POS systems which the customer will now replace with wireless systems.
What is one Important security action that the wireless solution supports to comply with PCI DSS?
A
can´t use factory default settings as a security
A customer requires new MCs for a large multi-site network with about 600 AP-535S ana 30,000
wireless clients. The customer requires redundancy for the MCs, with each MC being able to handle
the full toad in a failover situation The network should be able to sustain the loss of a controller with
stateful failover within seconds. It should be able to undergo software upgrades without downtime.
The architect has recommended two 7240XM MCs. The customer points out that 7220 MCs can
support their requirements and wonders why the architect recommended me 7240XMS.
What should the architect explain?
D
Refer to the exhibit.
A hospital needs an upgrade to 802.1tax for its wireless network. The wireless network supports:
* wireless medical devices
* medical staff voice communicators
* laptops in nurse stations
* medical staff tablets
* visitor and patient personal devices.
All of these devices support both the 2 4GHz and 5GH2 band. Assuming about a max throughput
on50 Mbps per AP; the hospital would like. The architect has used VisualRF to plan the AP placement
on one of the floors, which the hospital expects will need to suppod about 800 win
to deploy APS in stairwells between floors.
How well does the plan meet the requirements?
C
Refer to the exhibit.
A customer needs a wireless network upgrade and has these requirements.
- Support any applications used on a wired connection
- Support up to 2500 wireless clients
- Support seamless roaming from floor to floor and building to building
- Continue to function seamlessly if one controller fails
The architect has designed the logical infrastructure for the network as shown in the exhibit
Which change should the architect make to belter meet customer requirements and besl practices?
B
should be "add two maps subscriptions" need 2x100000 squaer feet